We offer the careful planning, coordination and execution that is required by the construction industry through our project managers. They make sure our projects are completed on time, within budget and meet all required quality standards.
LOMAR OFFICE
Before / After
A dated office with an inefficient layout, poor lighting and no clear identity was transformed into a modern, high-performance workspace with bespoke joinery, layered lighting and a fully optimised spatial flow.
Scope
- Full strip-out and structural alterations
- Electrical and lighting redesign
- Bespoke joinery and wall panelling
- High-quality finishes and materials
- Meeting rooms and breakout area fit-out
- FF&E procurement and installation
Budget
£850,000
Timeline
14 – 20 Weeks
CAMDEN SQUARE RESIDENCE
Before / After
An underutilised property lacking coherence was reimagined into a contemporary, high-functioning home with improved layout efficiency and strong design identity.
Scope
- Internal reconfiguration
- Flooring and ceiling replacement
- Lighting and electrical upgrades
- Joinery and storage solutions
- Decoration and finishes
- Partial FF&E specification
Budget
£550 000
Timeline
12 – 18 Weeks
GRILANDIA MAYFAIR
Before / After
A basic commercial unit was transformed into a high-impact hospitality space designed to increase dwell time, brand perception and revenue per customer.
Scope
- Full commercial fit-out
- Mechanical, electrical & plumbing (MEP)
- Bespoke bar and joinery installations
- Lighting concept for atmosphere and zoning
- Branding integration into interior
- Coordination with kitchen and specialist suppliers
Budget
£850,000
Timeline
10 – 16 weeks (fast-track available)
HARLEY STREET CLINIC
Before / After
A clinical and outdated space was elevated into a premium medical environment balancing compliance, comfort and high-end aesthetics to attract private clients.
Scope
- Strip-out and medical-grade fit-out
- Compliance with healthcare standards
- MEP upgrades and specialist installations
- Bespoke cabinetry and treatment rooms
- Reception and waiting area design
- Finishes aligned with premium positioning
Budget
£100,000
Timeline
10 – 14 weeks
Beirut Knightsbridge
Before / After
Knightsbridge restaurant fit-out combining elevated materials, signature brand details and lighting design that photographs beautifully day and night. High-end hospitality interiors in Knightsbridge built for heavy use, easy maintenance and consistent guest experience.
Scope
- Strip-out and medical-grade fit-out
- Compliance with healthcare standards
- MEP upgrades and specialist installations
- Bespoke cabinetry and treatment rooms
- Reception and waiting area design
- Finishes aligned with premium positioning
Budget
£100,000
Timeline
10 – 14 weeks
Oliviya – Hampstead
Before / After
Hampstead restaurant interior fit-out designed for atmosphere, operational flow and a high-end guest experience. Hospitality design and build in Hampstead featuring custom banquette seating, statement lighting and durable, commercial-grade finishes.
Scope
- Strip-out and medical-grade fit-out
- Compliance with healthcare standards
- MEP upgrades and specialist installations
- Bespoke cabinetry and treatment rooms
- Reception and waiting area design
- Finishes aligned with premium positioning
Budget
£100,000
Timeline
10 – 14 weeks
TK Kitchen
Before / After
TK Kitchen is a modern Pan-Asian restaurant in Chiswick, designed as a moody, immersive world of bespoke CNC craftsmanship and cinematic lighting. Every detail is custom-made to turn dining into discovery.
Scope
- Strip-out and medical-grade fit-out
- Compliance with healthcare standards
- MEP upgrades and specialist installations
- Bespoke cabinetry and treatment rooms
- Reception and waiting area design
- Finishes aligned with premium positioning
Budget
£100,000
Timeline
10 – 14 weeks